Facilities Services

Services

Emergency Preparedness

Key Control Office

Motor Pool

Recycling

Sign Shop

Space Scheduling

Work Requests

Management & Planning

Buildings

Projects & Reports

What's New

Work Units

Director of Facilities

Building Services

Engineering Services

Environmental Health & Safety

Information Services

Construction Services

Maintenance Services

Project Management

Space Management

Support Services

 

 


Project # 319575

Daniel J. Evans Library

Library Building

Description:

The Daniel J. Evans library building remodel is a preservation and life safety renovation project. Structural, mechanical and HVAC system and program space improvements will be made to the building. There will be minimal changes to the exterior.

Renovation of the 360,000 square foot building has been broken down into two phases. Phase I encompasses the B & C wings and is underway this biennium (03-05). Improvements will be made to the library, computer, media, photo areas and the building infrastructure (seismic, HVAC, electrical, plumbing, life safety, etc.).

Funds are being requested in the 05-07 capital budget to complete the second phase of the renovation. This will improve administration offices, classrooms, fourth floor, lobbies & infrastructure.

Temporary Locations for Evergreen Units/Offices
affected by Phase I construction | PDF

Project Schedule:

August 30, 2004 | Excel

Phase I Design Drawings:

Overall Basement & 1st Floor Plans | PDF

Overall 2nd & 3rd Floor Plans | PDF

Daniel J. Evans Library Building Energy Life Cycle Cost Analysis | PDF

Project Value Analysis Workshop Summary| PDF

Project Budget:

$21,000,000 (Phase I)

Project Management:

The Evergreen State College
Facilities Services
Azeem Hoosein, Assistant Director for Project Management, Facilities Services
Phone (360) 867-6041
FAX (360) 866-6791
Email: hooseina@evergreen.edu

Hal Van Gilder, Project Manager
Phone (360) 867-6355
FAX (360) 866-6791
Email: vangildh@evergreen.edu

Architect:

Studio Meng Strazzara
80 Yesler Way, Suite #200
Seattle, WA 98104
(206) 587-3797 Phone
John E. Bennett, AIA, Principal
Diane Monroe, AIA, Senior Architect

Contractor:

Pease Construction, Inc.
3815 100th Street SW Suite 3A
Lakewood, Wa. 98499
(253) 584-6606 Phone
Cary Wilson, Project Manager

The PDF files can be viewed with the Abobe Reader:

 

 

Contact the Site Manager

 

Last Updated: September 23, 2008


The Evergreen State College

2700 Evergreen Parkway NW

Olympia, Washington 98505

(360) 867-6000