CAB Update for September 23, 2009

Inside:

Demolition continues. Interior walls and flooring have been removed. Windows have begun to be removed. Asbestos abatement is almost complete.

Outside:

The new outside ADA ramp to Red Square is being framed and the concrete formation of the first floor entryway has begun.

First Floor Entryway
2nd Floor Bookstore
2nd and 3rd Floors Interior Demolition
Removing Non-Insulated Windows