CAB Update for November 4, 2009

Inside:

The seismic wall in the new third floor Student Activities conference room is being poured. The third floor restrooms are being framed. New gas service has been brought to the first floor Greenery. The basement mechanical room has been gutted and new coils are being installed. Duck work and large conduit runs for the new electrical system continues. Jack hammering and demolition continues.

Outside:

The concrete floor of the new west addition is being poured this week along with the new stairway from Red Square to the first floor entry and ADA ramp.

 

Pouring concrete in the seismic wall in the new Student Activities Conference Room
Framing the walls for the 3rd floor restrooms
Preparing to pour the new floor slab of the lower west entry addition
Pouring concrete for the new west entry staircase